OLD Mandurah Traffic Bridge Replacement in WA Description: OLD MANDURAH TRAFFIC BRIDGE REPLACEMENT in WA Product Name: Long piling with end plate,driving shoe Specification: AS1579 / AS3678 Grade 350 L0 450x10x20000mm/15000mm 610x...
Description: OLD MANDURAH TRAFFIC BRIDGE REPLACEMENT in WA
Product Name: Long piling with end plate,driving shoe
Specification: AS1579 / AS3678 Grade 350 L0
450x10x20000mm/15000mm
610x16x8000mm/24000mm
Quantity: 114 Lengths
Country: Australia
Year: 2016
Description: Tubing used for piling construction for project less than 100m depth. With concrete poured into tubing body as support foundation.
Product Name: Tubing
Specification: 88.9*11*6000mm; 114.3*11*6000mm, J55/N80Q/P110
Quantity: 2000Tons
Country: Korea
Year: 2016